API RP 17Y First Edition PDF
This recommended practice covers the design, specification, testing, qualification, installation, commissioning, and operation of subsea chemical injection delivery systems (excluding workover and subsurface equipment). It covers subsea chemical injection delivery systems from the chemical storage tank located on a host facility (onshore or offshore) to injection points subsea with a holistic approach. It discusses interfaces between topsides, subsea, and subsurface scopes, as well as between engineering, mechanical equipment, and controls.